Timber paling fencing
A practical boundary system for side and rear fences, with the timber, height and spacing selected around privacy, site conditions and the required finish.
Timber fencing · Brisbane Northside & selected Greater Brisbane areas
From practical paling fences to lapped and capped privacy fencing, feature screens and matching gates, we assess the full run, access, ground conditions and finish before preparing a clear quote.
01
New boundary fencing
02
Full fence replacement
03
Privacy & feature fencing
04
Fence + retaining packages
The timber-fence pathway
A timber fence can be a straightforward, repeatable construction task and still be treated with care. The line, post rhythm, ground clearance, transitions and gate details are what separate a boundary that merely closes a gap from one that properly finishes the property.
For a standard run, we keep the scope clear and the quoting information practical. Where the fence meets retaining, a driveway, a front gate or a more designed landscape, we can coordinate those interfaces as part of a broader external package.
Timber fencing on real sites
What we can build
A practical boundary system for side and rear fences, with the timber, height and spacing selected around privacy, site conditions and the required finish.
A more substantial presentation with increased overlap and a clean top line for boundaries where privacy and finish both matter.
Considered timber rhythm for front boundaries, courtyards, bins, services and selected privacy screens where a standard paling fence is not the right visual answer.
Pedestrian gates and selected access gates planned with the fence so the frame, clearances, hardware and material language belong together.
Still comparing styles and materials? Read our guide to planning a timber fence in Brisbane.
A quote that reflects the real site
Length is only one part of a useful quotation. We assess the complete run, removal, access, ground conditions and finish so the scope reflects what the property actually requires.
Send measurements & photosOne boundary, one coordinated plan
Fence posts, wall position, levels and access all affect one another. Treating the wall and fence as separate decisions can create compromises at the exact line that needs to remain straight and resolved.
For suitable projects, The George Legacy can discuss the retaining and timber-fencing scope together, along with adjoining gates, paths, concrete or landscape work.
Quote-ready in one sitting
01
Your suburb and postcode so we can check service fit and scheduling.
02
Approximate total length, required height and any gates or returns.
03
Wide views of the full run, both ends, the ground line and the access path.
04
Whether it stays, needs partial repair, or requires complete removal.
05
Paling, lapped and capped, hardwood, feature battens—or tell us if you need guidance.
Northgate-based
Our base is Northgate 4013. The timber-fencing push is focused on Brisbane’s northside and suitable projects across Greater Brisbane, with route planning based on scope, access and current crew scheduling.
Areas we can assess include Northgate, Nundah, Virginia, Wavell Heights, Hendra, Clayfield, Kedron, Chermside, Stafford, Aspley, Everton Park, Sandgate, Brighton and surrounding suburbs. Being outside this list does not automatically rule a project out.
Timber fencing questions
Yes. Straightforward timber boundary fencing is a priority service, alongside lapped-and-capped privacy fencing, feature timber sections and matching gates.
Yes, where included in the agreed scope. Photos of both sides, the full length and the access path help us account for removal and disposal before quoting.
Potentially. Localised repairs are handled through Care & Restore. If posts, rails or the wider run have reached the end of their useful life, full replacement may be the better-value pathway.
Fencing and retaining can often be planned together. The wall, post locations, levels and construction sequence need to be considered as one site-specific scope.
No. Height, timber, style, access, slope, removal, gates and ground conditions materially change the scope. We use your measurements and photos to assess the job before preparing a useful quotation.
Send the suburb, approximate length and height, clear photos of the full boundary and access, your preferred style, and whether an existing fence needs to be removed.
Ready for a useful first assessment?